The READIN Family Album
Happy together (Sept. 8, 2001)

READIN

Jeremy's journal

If you think, "I breathe," the "I" is extra. There is no you to say "I." What we call "I" is just a swinging door which moves when we inhale or when we exhale.

Shun Ryu Suzuki


(This is a page from my archives)
Front page
Most recent posts about Projects

Archives index
Subscribe to RSS

This page renders best in Firefox (or Safari, or Chrome)

Saturday, February 5th, 2005

A month ago I posted the story of a glue-up gone wrong. Today I glued up a second similar cabinet and thanks to input from the gang at WoodCentral, it went much better. The key difference: as advised by William Duffield, I did not put the backer boards in slots, but instead cut a rabbett and will nail them in place after the frame is dry. This means in the glue-up, I only have to worry about four boards instead of ten, much more reasonable. Also I thought through my clamping beforehand, so it was easy to get everything put together once the glue was on; and I made pinch sticks to measure the diagonals of the cabinet. I think these will be my most successful dovetails to date, which is not saying too much but is a good feeling anyways.

posted evening of February 5th, 2005: Respond
➳ More posts about Sylvia's room

Sunday, January 30th, 2005

The wall unit for Sylvia's room is coming along nicely (though I expect to be done in March now, not February) -- tonight while I was cutting dovetails for the remaining section of it, Ellen and Sylvia were painting one of the completed sections.

Sylvia and I went over to Mark's house today, where Christine and Bill also came to visit. We had a great time, including watching Harold Lloyd movies and learning from Bill how to play "Just Like Tom Thumb's Blues".

posted evening of January 30th, 2005: Respond
➳ More posts about Home improvement

Thursday, December 30th, 2004

🦋 Dovetails cont.

This evening I glued up the frame for a section of the wall unit I am building -- I described cutting the dovetails in my previous post. The end result is pretty good (if slightly off square); but the glueing-up process can only be described as a failure.

The plan was as follows:

  1. Lay the right-hand side board on the bench top, outer face down.
  2. Put (Elmer's white) glue on the right-hand pins of the top and bottom boards, and join them to the side board.
  3. Slide the backing boards into the grooves cut in the top and bottom boards.
  4. Put glue on the left-hand pins of the top and bottom boards, and join the left-hand side board to them.

Straightforward enough -- what I didn't realize was I needed something to hold the top and bottom boards close to each other as I was sliding in the backing boards... I see now that what I should have done, after about the first three backing boards were in place, was fix a clamp to hold everything in place. (I think but am not sure, that my longest bar clamp would be just about long enough to do the job.) Instead, when the backing boards started falling out, I ran upstairs and started screaming bloody murder for Ellen to come help me hold boards in place. And she did, and everything came out all right in the end, except I wish I could keep my head on straight when a problem comes up.

posted evening of December 30th, 2004: Respond

Wednesday, December 29th, 2004

🦋 Dovetails

I've been working for a while now on a wall unit/desk for Sylvia's room; making pretty good progress. I'd say I'm a little ways past the halfway point which means delivery around February. Right now I am framing the upper level of shelf units (the piece is made up of 2 lower units, 2 upper units, the desk, and some smaller "cubby" pieces), and using dovetails to join the frames together. This is about the 4th time I have cut dovetails, and the first I am using them somewhere they will not be visible. (Which is actually probably the better thing to do first -- but it did not work out that way.)

I cut all the pins yesterday and the day before, and last night did my first set of tails, second set this morning. It is going pretty quick and the results are noticeably better than any I have previously done (with one possible exception -- the cherry dovetails I did for a jewelry box came out pretty nice but those don't count because (a) they took me a really long time and (b) I never finished building the jewelry box). They fit, quite tight, with very little adjustment. ("Adjustment" = "messing around with a chisel, trying to make the dovetails fit even though the cuts were not in the proper place".) I'm a little surprised because the cuts are visibly not exactly straight nor square, and the marking imprecise; my conclusion is that dovetails (at least in softwood) are a forgiving joint.

Update: Finished the 3rd and 4th sets of tails, an hour and a half from marking to fitting. And very little messing around with a chisel.

posted morning of December 29th, 2004: Respond

Wednesday, December 22nd, 2004

🦋 A simple water-saving home improvement

In the course of remodeling our bathroom, which will happen next month, I will be installing an on-demand hot water recirculation pump I bought from Advanced Conservation Technology of Costa Mesa, CA. I am just speaking on supposition right now as I have not used the pump yet; but it just seems like a really good thing to do without any downside -- you get your hot water without standing around waiting; and you avoid wasting ~10,000 gallons of water/year that would otherwise run down the drain while you're waiting. So I'm encouraging anyone who owns their own home to do this. It's not very expensive (~$350) or difficult to install. ACT is not the only company that sells these pumps. BuildingGreen.com has an article about them.

posted afternoon of December 22nd, 2004: Respond
➳ More posts about Bathroom Renovation

Sunday, August 8th, 2004

The saga of repairing my patio continues...

The story so far: when we moved into this house it had a broken-up, uneven bluestone patio in the back yard, and I thought I would like to learn how to fix it, make it flat and even. Ellen's cousin Danny came over and offered to donate some slate flagstones he had in his side yard toward the cause. (At that point I thought the patio was made of slate.) After getting them home I realized they would not work in the back yard, and decided instead to build a walkway/garden border in the front yard. I did that last summer -- it came out really well (or at least "really well for a first masonry project by someone who didn't have much of a clue") and I had some slate left over. This spring I extended the walkway back past the side of our house, next to the garage. And I was ready to start on the patio itself!

So two weeks ago I drove down to Brick, NJ, where there is Bedrock Stone, excellent stone yard that I recommend wholeheartedly. Bought a pallette of 1 1/2" rectangular bluestone and a pallette of broken bluestone pieces; and on the way home I stopped at Maplewood Garden Supply to get 3 cubic yards of bluestone dust. (Note: the dump truck which brought the dust would not have been able to get into our back yard, were it not for the new gate I built. Nice feeling.) That stuff has been sitting in our driveway for the past 2 weeks; and when my father came to town this weekend, I asked if he'd like to help me work on the patio. He was game, and we completed the work I was hoping to get done -- namely, the narrow part of the patio (4' X 27') that runs from the driveway to the main patio. This part had previously been extremely broken up -- hence the new flag stones -- and repaired in patches with slate. We put in a layer of dust to even the ground beneath it, and laid in new stones, and built a low border from the broken stone pieces. The old flag stones that I could salvage are stacked in the driveway, waiting to be used in extending the main part of the patio back into the yard a little ways, which may happen as soon as this fall. First I need to get to evening up the main part of the patio, where the stones are mostly whole or else cleanly broken, so I will be able to use the existing stones. (This is good because they are 1" thick and thus possible for me to lift without a second person.) That will be happening at the end of the month, if all goes according to plan.

posted evening of August 8th, 2004: Respond
➳ More posts about Patio

Friday, June 18th, 2004

🦋 Weekend update

We went to a Kerry house party tonight, at Mark and Marina's place. It was a very nice time -- not quite inspirational, but definitely encouraging. Kerry's elder sister Peggy spoke about the campaign, and about her brother's commitment to getting the U.S. out of the hole it's presently in. Ellen and I decided to do some volunteer work over the summer.

Lots of digging in store for me tomorrow! I hope it is not too hot -- Ellen has a lot of plants for me to put in the ground, plus two large bushes for me to take out of it. (One is dead, and the other needs to be transplanted.) And I want to make a start at extending my stone path back along the side of the house, underneath the gate I built. Tomorrow afternoon there will be a going away party for Jim (who is moving to Vermont).

posted evening of June 18th, 2004: Respond
➳ More posts about Driveway Gate

Thursday, June 17th, 2004

Brad DeLong pointed me to a very nice site: Joel on Software is the musings of Joel Spolsky, founder of Fog Creek Software and a very insightful guy.

posted afternoon of June 17th, 2004: Respond
➳ More posts about Programming

Thursday, May 20th, 2004

I've been working for a little while (about a week since I bought the lumber I guess) on building a new pair of gates for our driveway. The old ones were poorly designed -- two 5' gates hung from metal poles at either side of the driveway and meeting in the middle, swinging toward the back of the driveway. The problem was, they did not actually swing; the wooden gates were far too heavy for the hinges to support, so they were actually resting on the bottom corner at the center of the driveway. When you wanted to open a gate you had to either lift it up, or drag it along the asphalt -- either one is a hassle.

So here's my bright idea: One 8' gate hanging from the pole on the outside of the driveway (i.e. the side away from the house). It has a caster on the side that is not on hinges; so instead of swinging it rolls open and closed. Additionally it has a drop bar to anchor it in the closed position. The pole on the inside of the driveway comes out as does the short fence from the house to the pole, and a 3' gate hangs from the fence post at the side of the house. It swings toward the front of the driveway. So the deal is, you usually keep the big gate closed, with the drop bar in the ground, and go in and out through the little gate.

I finished building the big gate on Tuesday, and today I hung it on the pole. It looks pretty good, and it rolls just fine. (I may at some point need to replace the cheapo caster with something more durable though.) Ready to start work on the little gate. I will rent a jack-hammer from Home Depot to take the pole out of the ground -- this is kind of exciting as I have never used a jack-hammer before.

posted evening of May 20th, 2004: Respond

Monday, May 17th, 2004

🦋 Recipe blogging: refried beans

Refried beans are a favorite dish of mine and I like to cook them now and then. I made them yesterday for my birthday party barbecue, and they came out very well. Here's how you do it:

  • Soak about a pound of dry pinto beans overnight, in the refrigerator. I like to buy beans from places that sell them in bins; the bagged beans from Goya are not so good. I don't know if it's relative freshness or what. When you soak the beans, be sure to use enough water; I usually cover them to about 2-3 times the height of the dry beans.
  • About 2 hours before you want the beans to be ready, put them up to boil in a stock pot, partially covered. Good things to add to the water are several bay leaves, and a yellow onion cut in half (with the skin on).
  • While the beans are boiling, get the seasonings ready: roast and grind about 1/4 cup of cumin seeds and a Tbsp. of anise seeds; and reconstitute some dried chilis. You do this by pouring boiling water on them, waiting about 20 minutes, and then scraping the chili paste away from the skin with a spoon. Also you should be checking the beans occasionally to see that they are at a slow boil and are not too dry -- if they are, add water and return to a boil.
  • When the beans are soft, fish out the bay leaves and onion (you could probably mash the onion and return it to the pot, but I have never done this), and turn the heat up to high. The water will start boiling away -- keep stirring and scraping the bottom of the pot, and you will wind up with a sort of pasty consistency.
  • Empty the pot into a bowl; heat up about 3-4 Tbsp. oil (canola or lard) in the bottom of the pot and fry 5 or 6 chopped yellow onions and about half a head of garlic, with the cumin and anise and chili paste. After about 5 minutes add the beans back in and lower the heat down to a simmer.
  • You're basically good to go now -- my rule of thumb is that the longer this mixture simmers the better (within reason), but the downside is you need to pay some attention to it so it does not dry out or burn to the bottom of the pot. I usually end up simmering it for 15 minutes or so.

posted evening of May 17th, 2004: Respond
➳ More posts about Food

Previous posts about Projects
Archives

Drop me a line! or, sign my Guestbook.
    •
Check out Ellen's writing at Patch.com.

Where to go from here...

Texts
Programming
Woodworking
Music
South Orange
Friends and Family
Blogs
Comix