The READIN Family Album
Adamastor, by Júlio Vaz Júnior

READIN

Jeremy's journal

The only real thing that exists at this moment on earth is our being here together...

José Saramago


(This is a page from my archives)
Front page
More recent posts
Older posts
More posts about:
Shoe rack
Woodworking
Projects

Archives index
Subscribe to RSS

This page renders best in Firefox (or Safari, or Chrome)

🦋 Success!

Well my last glue-up involving mortise and tenon joints (Coleman's desk) was an ignominious affair to say the best of it -- suffice to say it involved a lot of rage on my part, enough to frighten Ellen and Sylvia, and all to no avail (so to speak) -- the glue up was not successful and resulted in some yucky joinery. To contrast with today's endeavor, which came off mostly without a hitch -- and looks fine, better indeed than I had expected: this time I did repeated dry runs and corrected problems, last time not so much; and last time I was expecting my joinery to look "professional", this time my expectations were a good deal lower.

In short, I have gotten better at joinery, and have developed a more realistic assessment of my abilities. Nice combination!

At 7 this morning I asked Ellen for 2 hours to work on the shoe rack, she said ok, see you at 9; and I went downstairs. First thing I noticed was oh shoot, I haven't joined the back of the case like I had been meaning to -- this may take a bit more than 2 hours -- and I started in on that (pretty simple) joinery. This basically meant marking and drilling 8 holes, and smooth planing 2 boards.

While I was working on this, Ellen and Sylvia came down, Ellen to do some ironing and Sylvia to watch everything that was going on. "What you doing, da-da?" So I took a little time out to tell her about the project, and she watched me drilling holes for a little while. And watched me knock apart the dry fitted rack. It was during this knock-down that I made my last adjustment, filing a bit off the side of a too-tight tenon. During this process I arranged all the pieces in the correct orientation, so I would not have to turn them around too much while gluing. Then I set up my gluing area -- pot full of Elmer's white PVA glue, and a wet flux brush; and went to work!

And voila, everything flowed very smoothly. I was a bit nervous about the fact that I had not done a dry fit of the rear joinery -- but it was not a problem. Everything hammered together quite cleanly. I at first was not going to clamp it because the friction of the joints was enough to hold everything in place; but then I realized some strategically placed clamps would get rid of some gaps between tenon shoulder and stile. So I did that; I swept up the shop; and I came upstairs and looked at the clock. 9:00!

Well this project has taken me approximately 3 times as long as any previous one. I think in the end, the time was put to pretty good use -- I have learned a lot and I think gotten more patient as well. Next things on my list of stuff are a banquette for our kitchen; a sandbox for Sylvia; and some fixtures for my shop.

posted morning of Sunday, April 27th, 2003
➳ More posts about Shoe rack
➳ More posts about Woodworking
➳ More posts about Projects

Respond:

Name:
E-mail:
(will not be displayed)
Link:
Remember info

Drop me a line! or, sign my Guestbook.
    •
Check out Ellen's writing at Patch.com.

Where to go from here...

Friends and Family
Programming
Texts
Music
Woodworking
Comix
Blogs
South Orange
readinsinglepost